Open and in-progress jobs 8
| Priority | Job | Where | Status | Logged |
|---|---|---|---|---|
| Critical | Shore power post fault on Pier A near A-03 FIS-2026-0002 · PowerPostFault |
Pier B · Berth A02 | In progress | 6 Oct |
| High | Broken cleat on Pier B berth B-07 FIS-2026-0001 · BrokenCleat |
Pier A · Berth A01 | Open | 7 Oct |
| Normal | Lighting issue on Pier A walkway FIS-2026-0010 · Other |
Legacy Pier A (Retired) · Berth C02 | Open | 1 Oct |
| Normal | Pier D ladder rung corrosion (near D-18) FIS-2026-0004 · Other |
Pier D (Guest) · Berth A04 | In progress | 3 Oct |
| Normal | Loose plank on Pier C walkway mid-span FIS-2026-0003 · Other |
Pier C · Berth A03 | Open | 5 Oct |
| Normal | Slip bumper replacement at Pier B berth B-02 FIS-2026-0013 · Other |
North Access Pier · Berth D01 | In progress | 6 Oct |
| Low | Water tap leak at Pier D service point FIS-2026-0005 · Other |
Service Pier · Berth B01 | Open | 2 Oct |
| Low | Power post label and meter window cracked at Pier C FIS-2026-0012 · PowerPostFault |
South Access Pier · Berth C04 | Open | 4 Oct |